
Check the position and access route
Before delivery
We check equipment dimensions, the access route and installation conditions so the scope can be agreed before delivery.
01 · Doorways, corridors, lifts and stairs
02 · A level floor with sufficient load capacity
03 · Power supply and ventilation clearance
04 · Water supply and drainage where required
Equipment handed over ready to use
- 01
Equipment details and access
Model, dimensions, site address, access route and preferred working time.
- 02
Delivery and positioning
The equipment is moved to the agreed position, aligned and levelled.
- 03
Connections and commissioning
Connections are completed according to the equipment and agreed scope, then start-up is checked.
- 04
Testing and handover
Temperature, door operation and main functions are checked, and basic use is explained.
What does installation include?
- 01
Delivery
Delivery time, receiving arrangements and the access route are agreed before arrival.
- 02
Positioning and levelling
We check service and ventilation clearances, door opening and equipment stability.
- 03
Operating checks
The equipment is started and its controls, temperature and main functions are checked.
- 04
Operating guidance
We explain basic operation, cleaning and maintenance requirements.
Each equipment type has its own requirements
Send the model and site address
If you have not chosen a model, describe the intended use, capacity and installation position. Our sales team will help you select suitable equipment.




