from €68.20
Delivery across Estonia, to the external door

Before delivery
We check the equipment dimensions, the access route and the conditions at the installation site, and agree the scope of work.
01 · Doorways, corridors, lifts and stairs
02 · A level floor with sufficient load capacity
03 · Power supply and ventilation clearance
04 · Water and a drain, if the equipment needs them
Model, dimensions, site address, access route and preferred working time.
The equipment is moved to the agreed position and levelled. Maintenance and ventilation clearances and door opening are checked.
The connections required by the equipment and the scope of work are made. Connections, settings and commissioning are checked. The exact commissioning procedure depends on the model.
Temperature, door operation and main functions are checked, and use, cleaning and maintenance needs are explained.
We install and commission equipment that we sell ourselves, and we check before delivery that it suits the installation site.

The installation price depends on the call-out, the actual working time and the parts and materials used. The rates include VAT and are valid from 1 July 2025. The minimum chargeable time is 30 minutes. All rates are in the service price list.
Delivery across Estonia, to the external door
Carrying the equipment into the room and up the stairs, per hour per worker
Call-out on working days 9:00 to 17:00: in Tallinn up to 15 km, or up to 20 km and outside the city
Labour hour on site, working days 9:00 to 17:00
Stock items arrive in 3–7 working days, goods ordered from the manufacturer in about 2–5 weeks, and special orders take longer. The delivery terms are on the delivery page.
Equipment carries a 12-month warranty, and GRAM Bioline and GRAM Professional products carry a 24-month warranty. The terms are on the warranty page.
A call-out on a working day costs €43.40 (in Tallinn up to 15 km) or €55.80 (up to 20 km and outside the city), and a labour hour on site costs €68.20, all with VAT. The final installation price depends on the call-out, the actual working time and the parts and materials used. The minimum chargeable time is 30 minutes. All prices are in the service price list.
Stock items arrive in 3–7 working days, goods ordered from the manufacturer in about 2–5 weeks, and special orders take longer. Installation can be ordered with delivery: mention in your request that you also need installation and commissioning, and we will plan the delivery and installation together.
Send the model, a photo of the rating plate and a description of the installation site. We can then assess connections, access and whether we can carry out the required work.
We carry the equipment into the room and up the stairs. This is charged in addition at an hourly rate of €49.60 per worker. State the floor, whether there is a lift and the width of the doorway in your request. Removal of the old unit is not automatically included in installation: state its dimensions and location and that you want it removed, and we will confirm separately whether this is possible.
A clear, wide enough route to the installation site, a level, load-bearing floor, a suitable power supply, and water and drain connections if the equipment needs them, an ice machine for example. Existing connections need to be checked against the model's requirements before the visit. Tell us about any missing connections: the scope of work and responsibility for them are agreed before delivery. Send the model and site address and we will check what is needed.
Do not put it next to an oven, cooker or radiator, or in direct sunlight, because the compressor then works harder and the equipment may not hold its temperature. The manual or the rating plate states the climate class, which shows what room temperature and humidity it is designed for. If the kitchen is hot, or the room is damp or unheated in winter, mention this in your request, because it affects which model is suitable.
Yes. You need to allow for door opening, maintenance access and the model's ventilation requirements. Do not choose a position using the cabinet dimensions alone; send the room dimensions or a photo so the necessary clearances can be checked.
If the unit was transported upright, a few hours is usually enough. If it was transported on its side or at an angle, wait longer, up to 24 hours for some models, because the oil has to run back from the pipework into the compressor. You will find the exact time in the manual. You can load your goods once the unit has reached the specified temperature.
If you have not chosen a model, describe the intended use, capacity and installation position. Our sales team will help you select suitable equipment.