Planning
Equipment, capacities and layout to suit the rooms and their use.


Project sales are for solving refrigeration as a whole: a new restaurant, café, shop, bakery, production site or warehouse. One company is responsible for it all: we choose the equipment, plan the layout, deliver, install, commission and later maintain it.
We start with what you store or sell, how much and in which rooms. We then work out the equipment list, layout, cold rooms, condensing units and schedule. The quote itemises equipment, delivery, installation and commissioning, so you see what you pay for.
Floor plan, use of the rooms and the target opening date.
Equipment list, layout, schedule and price.
We deliver and install at the agreed time.
We commission the equipment and hand it over ready for use.
Equipment, capacities and layout to suit the rooms and their use.
Refrigeration equipment, cold rooms and condensing units from one supplier.
Delivery, connections, commissioning and handover.
Warranty and planned maintenance, also after opening.
A cold chain solution keeps the right temperature along the whole route. We map what happens in each work area and choose the equipment accordingly.
Read more in the guide refrigeration solutions from storage to display.
A self-contained unit has the compressor and condenser inside it. It is easy to install and to move if needed, but the heat and noise stay on the shop floor. If you have many such units, that heat has to be taken into account when cooling the room.
With a separate condensing unit or a central system, the heat and noise stay off the shop floor. This requires pipework and a place for the condensing unit, so it has to be planned before the shop fittings are installed.
Goods are easy to take from an open multideck display fridge, but some of the cold air flows onto the shop floor and energy use is higher. Doors reduce the loss of cold and help keep the temperature even.
We fit out both new and existing sites with refrigeration equipment. You can find solutions by sector: restaurant, shop, hotel, bakery, flower shop, medical and industry. You can see examples on the completed work page.
A floor plan or room dimensions, a description of what you store, prepare or sell and in what quantity, and the target opening or completion date. You do not need an equipment list: we draw up an initial solution from this information.
The quote separates equipment, delivery, installation and commissioning. Preparatory work and each party's responsibilities also need to be clarified, so that it is clear what the price includes and what needs a further agreement.
Yes, we fit out both new and existing sites with refrigeration equipment. Describe which equipment will stay and what you want to change. From the existing space, connections and operations we assess how new equipment can fit into the overall setup.
It depends on the refrigerant: check the rating plate to see which one the equipment runs on. Equipment using R404A or R507A can carry on running, but from 2025 no new refrigerant may be added during maintenance, and from 2030 no recycled refrigerant either. With a major leak, consider replacing the equipment rather than repairing it. Add photos of the rating plates to your request so the upgrade plan can take this into account.
The requirements of the selected equipment need to match the site's existing or planned connections. Send the available technical information and plans. Before delivery, we clarify the necessary preparation and who carries it out.
Phasing depends on equipment availability and site readiness. In your request, state the construction or opening schedule and any rooms that will be finished at different times. Delivery and working times are agreed in the project.
Warranty terms depend on the equipment supplied and must be recorded in the quote or the handover documents. Planned maintenance can be agreed separately. At handover we go through questions on equipment operation and maintenance.